SSLV
ISRO2022 – 2024
Dimensions
- Height
- 34.0m
- Diameter
- 2.00m
- Launch mass
- 120.0t
- Lift-off thrust
- 2600kN
- Payload to low Earth orbit
- 500kg
- Family
- SSLV
Stages
Select a stage to pull the stack apart, then go inside to see its tanks, engines and other parts. Every value names its source.
Launch record
- Orbital launches
- 3
- Successful
- 2
- Failed
- 1
- Success rate
- 66.7 %
- First launch
- 2022-08-07
- Latest launch
- 2024-08-16
Drawing the rocket…
Stack assembled.
Schematic 3D view drawn from GCAT’s stage lengths and diameters; not a published model. Colours are neutral.
Every launch
3 orbital and deep-space launches since 2022, newest first. Outcome as GCAT records it.
20241
| Date (UTC) | Flight | Mission | Site | Outcome |
|---|---|---|---|---|
| 2024-08-16 03:47 | SSLV-D3 | EOS-08 | Sriharikota · FLP | Success |
20231
| Date (UTC) | Flight | Mission | Site | Outcome |
|---|---|---|---|---|
| 2023-02-10 03:48 | SSLV-D2 | EOS-07 | Sriharikota · FLP | Success |
20221 · 1 failure
| Date (UTC) | Flight | Mission | Site | Outcome |
|---|---|---|---|---|
| 2022-08-07 03:48 | SSLV-D1 | EOS-02 | Sriharikota · FLP | Failure |
Sources
- Dimensions, stages and launches: GCAT, J. McDowell (planet4589.org), CC BY 4.0; catalogue of 2026 Nov 27. GCAT