CHORUS
Go for LaunchEarth ScienceLEOFalcon 9 Block 5 · SpaceX04 Dec 2026, 12:55 UTC
Mission
- Name
- CHORUS
- Type
- Earth Science
- Target orbit
- Low Earth Orbit (LEO)
- Customer
- —
CHORUS is MDA's next generation Earth observation constellation, consisting of 2 radar satellites (C-band SAR and X-band SAR), in a 53.5 degree 600 km altitude LEO, with the X-band trailing the C-band by 60 minutes. A collaborative multi-sensor constellation, CHORUS will bring together diverse and unique imagery and data sources and provide a new level of near real-time insight and innovative Earth observation services. Operating in a unique mid-inclination orbit, CHORUS will be able to image day or night, regardless of weather conditions, with daily access of up to 95% of the coverage area. From an industry-leading 700km-wide imaging swath down to sub-metre high resolution, CHORUS will provide the most extensive and unrivalled Earth observation radar imaging capacity available on the market in a single mission. Also on board this mission are 2 satellites from ICEYE and PECCY.
Launch window
- NETNo earlier than
- 04 Dec 2026, 12:55 UTC
- Time known to
- the minute
- Window opens
- 04 Dec 2026, 12:55 UTC
- Window closes
- 04 Dec 2026, 13:24 UTC
- Length
- 29 min
- Local time at the pad
- 04 Dec, 07:55 GMT-5America/New_York
Status
- Status
- Go for Launch
- Meaning
- Current T-0 confirmed by official or reliable sources.
- Record updated
- 25 Nov 2026, 18:22 UTC
Source: Launch Library 2
Go for Launch
T−––:––:––
CHORUS
- Vehicle
- Falcon 9 Block 5
- Provider
- SpaceX
- Pad
- Space Launch Complex 40, Cape Canaveral SFS, FL, USA
- NET
- 04 Dec 2026, 12:55 UTC
Who is behind this launch
The source names no customer agency for this mission.
SpaceX
- Abbreviation
- SpX
- Founded
- 2002
- Launches (all)
- 749
- Successful
- 734
- Failed
- 15
- Planned
- 135
About
Space Exploration Technologies Corp., known as SpaceX, is an American aerospace manufacturer and space transport services company headquartered in Hawthorne, California. It was founded in 2002 by entrepreneur Elon Musk with the goal of reducing space transportation costs and enabling the colonization of Mars. SpaceX operates from many pads, on the East Coast of the US they operate from SLC-40 at Cape Canaveral Space Force Station and historic LC-39A at Kennedy Space Center. They also operate from SLC-4E at Vandenberg Space Force Base, California, usually for polar launches. Another launch site is being developed at Boca Chica, Texas.
Source: Launch Library 2
Target orbit
- Orbit
- Low Earth Orbit (LEO)
- Typical for this orbit class
- about 160–2,000 km altitude; one orbit takes about 88–127 minutes
- iLowest direct inclination from this pad
- 28.6°inferred
Source: Launch Library 2 · Lowest direct inclination from this pad: inferred
Vehicle
- Configuration
- Falcon 9 Block 5
- Family
- Falcon, Falcon 9
- Variant
- Block 5
- Manufacturer
- SpaceX
- Reusable first stage
- yes
- First flight
- 11 May 2018
- LLength
- 70.0m
- DDiameter
- 3.65m
- mLaunch mass
- 549t
- Payload to LEO
- 22,800kg
- Payload to GTO
- 8300kg
- FLiftoff thrust
- 7607kN
Launch record
- Launches
- 649
- Successful
- 648
- Failed
- 1
- Successes in a row
- 351
- Planned
- 120
- Booster landings
- 634 / 639
About
Falcon 9 is a two-stage rocket designed and manufactured by SpaceX for the reliable and safe transport of satellites and the Dragon spacecraft into orbit. The Block 5 variant is the fifth major interval aimed at improving upon the ability for rapid reusability.
Boosters and cores
| Stage | Serial | Flight of this unit | Previous flight | Turnaround | Landing |
|---|---|---|---|---|---|
| Core | B1090 | flight 15 | 16 Aug 2026 · Falcon 9 Block 5 | Globalstar 2-R Mission 1 (x 8) | 110 d 11 h | Return to Launch Site · Landing Zone 40 (LZ-40) · 0.3 km downrangeplanned |
- The Falcon 9 first stage B1090 will land back at the launch site after its 15th flight.
Source: Launch Library 2
Earlier flights of this vehicle
The 6 most recent flights of Falcon 9 in Jonathan McDowell’s GCAT. They show what this vehicle usually carries and from where; they are not the payload of this launch.
| Date (UTC) | Flight | Payload (GCAT) | Site | Outcome |
|---|---|---|---|---|
| 2026-11-24 16:08 | xxx/B1081.29 F706 | SBST TH-3 | Vandenberg · SLC4E | Success |
| 2026-11-22 12:23 | xxx/B1097.14 F705 | NRO Starshield C5 | Vandenberg · SLC4E | Success |
| 2026-11-21 04:20 | xxx/B1100.11 F704 | SBST R-6 | Vandenberg · SLC4E | Success |
| 2026-11-12 04:36 | xxx/B1103.7 F703 | SBST R-5 | Vandenberg · SLC4E | Success |
| 2026-11-07 00:48 | xxx/B1095.8 F702 | SBST R-4 | Vandenberg · SLC4E | Success |
| 2026-10-31 04:04 | xxx/B1093.18 F701 | Starlink Group 15-18 | Vandenberg · SLC4E | Success |
Earlier flights: GCAT, J. McDowell (planet4589.org), CC BY 4.0; catalogue of 2026 Nov 27.
Launch site
- Pad
- Space Launch Complex 40
- Site
- Cape Canaveral SFS, FL, USA
- Country
- United States of America
- φ λCoordinates
- 28.5619° N, 80.5774° W
- Time zone
- America/New_York
- Launches from this pad
- 404
- Launches from this site
- 1133
- Since the previous launch from this pad
- 4 d 21 h
- #Orbital launch attempt worldwide
- 7458 (285 this year)
- #Launch by this provider
- 753 (134 this year)
- #Launch from this site
- 1135 (59 this year)
- #Launch from this pad
- 406 (52 this year)
Source: Launch Library 2
Updates from the source
Notes by Launch Library 2’s editors, newest first, with the public source each one cites.
Countdown timeline
Events relative to liftoff (T−0) as the provider publishes them. Event names are the source’s.
| Time | Event | Description |
|---|---|---|
| T−00:38:00 | GO for Prop Load | Launch director verifies go for propellant load |
| T−00:35:00 | Prop Load | Start of propelland loading |
| T−00:35:00 | Stage 1 LOX Load | Start of liquid oxygen loading in the first stage |
| T−00:16:00 | Stage 2 LOX Load | Start of liquid oxygen loading in the second stage |
| T−00:07:00 | Engine Chill | Start of engine chilling |
| T−00:01:00 | Startup | The onboard computer takes control over the countdown and runs last checks |
| T−00:01:00 | Tank Press | Fuel tanks are pressurized to flight levels |
| T−00:00:45 | GO for Launch | Launch director verifies go for launch |
| T−00:00:03 | Ignition | Start of the engine ignition sequence |
| T+00:00:00 | Liftoff | First upwards movement of the rocket |
| T+00:01:08 | Max-Q | Maximum dynamic pressure |
| T+00:02:15 | MECO | Cut-off of the main engine |
| T+00:02:19 | Stage 2 Separation | Separation of the second stage from the first |
| T+00:02:23 | Stage 1 Flip | Flip maneuver of the first stage |
| T+00:02:26 | SES-1 | First start of the second engine |
| T+00:02:32 | Booster Boostback Burn Startup | Start of the booster boostback burn |
| T+00:03:02 | Fairing Separation | Separation of the payload fairing |
| T+00:03:28 | Booster Boostback Burn Shutdown | End of the booster boostback burn |
| T+00:06:01 | Entry Burn Startup | Start of the atmospheric entry burn |
| T+00:06:09 | Entry Burn Shutdown | End of the atmospheric entry burn |
| T+00:07:10 | Stage 1 Landing Burn | Start of the first stage landing burn |
| T+00:07:27 | Stage 1 Landing | Landing of the first stage |
| T+00:07:57 | SECO-1 | First cut-off of the second engine |
| T+00:46:32 | SES-2 | Second start of the second engine |
| T+00:46:37 | SECO-2 | Second cut-off of the second engine |
| T+00:51:04 | Payload Separation | Final deployment of the payload from the rocket |
| T+00:56:24 | Payload Separation | Final deployment of the payload from the rocket |
| T+01:54:36 | SES-3 | Third start of the second engine |
| T+01:55:13 | SECO-3 | Third cut-off of the second engine |
| T+02:00:38 | Payload Separation | Final deployment of the payload from the rocket |
| T+02:00:58 | Payload Separation | Final deployment of the payload from the rocket |
| T+02:01:18 | Payload Separation | Final deployment of the payload from the rocket |
Links
Webcasts
- MDA Space – MDA CHORUS Missionofficial · X · 04 Dec 2026, 12:35 UTC
Official and press pages
- SpaceXofficial · spacex.com
Sources
- Mission, agencies, vehicle, stages, pad, updates and links: The Space Devs, Launch Library 2 (detailed record; source updated 25 Nov 2026, 18:22 UTC). Refreshed every 30 minutes. The Space Devs
- Earlier flights: GCAT, J. McDowell (planet4589.org), CC BY 4.0; catalogue of 2026 Nov 27. GCAT